Ⅰ、Quality policy
Thoroughly tempered well-seasoned severe training and hammering to make competitive products!
Ⅱ、Quality Strategy
Continue to improve the quality constantly and record all issues for each batch sample and the mass production→Seeking out the precautionary measures,delving into quality hidden trouble→take relevant measures as precaution at the same time.
Ⅲ、Quality specifications:
1. Quality System: ISO-9001:2015, ISO13485:2016, and IATF16949:2016, ISO14001:2015
2. Quality Standard: IPC-A-610F-G class 2,
3. Quality control
Quality improvement activities: For product problems, comprehensive analysis from the aspects of human, machine, material, method, and environment, and implement quality improvement activities for all processes through PDCA
Continuous improvement plan: monitor quality implementation through weekly reports, monthly reports, and regular quality meetings, and formulate effective continuous improvement plans in a timely manner if it is found that the standards are not met
Engineering change and retrospective management: inspect and confirm the changed raw materials or finished products, and track management of model identification
Prevent recurrence of quality accidents: In order to prevent the recurrence of adverse events, the adverse events are included in the "Quality Resume Sheet" to collect and record the prone points, and the improvement methods are added to the control plan, FMEA, SOP and other documents
Staff training activities: For operators or quality personnel, conduct daily training on process discipline, zero defect concept, operation methods, defect identification and judgment, and quality issues at different stages
Continuous improvement of quality management: During the sample and trial production phase, PCBlayout production process, testing found problems and proposed improvement measures, and reminded customers to improve; Mass production phase, PCBlayout, production process, testing found problems and proposed improvement measures, and explored hidden quality hazards;
4. Soldering Standard: J-STD-001 class 1,2,3
5. ESD Standard: ESD-MIL-STD-1686
6. Workshop management:6S
7. SPI
8. On-line 3D AOI
9. FAI-first article inspection
10.On-line 3D AOI
11.X-Ray
12. Machine calibration and preventative maintenance
13. ERP material and process management ( ERP=enterprise resource planning computer system)
Ⅳ、Quality standards
IPC-A-610F-G
Ⅴ、RoHS management
Product compliant: RoHS&Reach
RoHS prohibited substances list :
NO. Name The upper limit(ppm=mg/kg)
1 Pb 0.1%(1000ppm)
2 Hg 0.1%(1000ppm)
3 Cd 0.001%(100ppm)
4 Cr VI+ 0.1%(1000ppm)
5 PBB 0.1%(1000ppm)
6 PBDE 0.1%(1000ppm)
7 DEHPE 0.1%(1000ppm)
8 BBP 0.1%(1000ppm)
9 DBP 0.1%(1000ppm)
10 DIBP 0.1%(1000ppm)
Ⅵ、ESD protection
1. Related testers for ESD protection:
Surface Resistance Meter Anti-Static Wrist Strap Detector Digital Static Tester
Measurement scop: Can conveniently check workers Measurement scop:0 - ±1.49kv ±
103-1012Ω anti-static wrist strap anywhere & 1.0kv - ±20.0kv
precision:±5% anytime, to eliminate quality issues precision:±10%
caused by bad wrist strap
2. ESD process protection
3. ESD delivery protection
Ⅶ、Components Control
1. Components selection:
a. Customer assigned brand:use the appointed brand and model only
b. not assigned parts:
Resistor、capacitor: YAGEO, Uniohm, FengHua
Tantalum Capacitor: AVX,KEMET
Electrolytic capacitor: CAPXON、 Panasonic
Film capacitors: Surong, KORCHIP
Inductor: MURATA, TDK, Sunlord
Relay:Sanyou, HongFa, Omron, Panasonic
MOS:AOS,IR,VISHAY
LED:Osram,KINGBRINGHT,EVERLIGHT
Semiconductor:National,Linear Technology,NXP,Philips,Siemens,ON,ZETEX,TI,ST
MCU:ATMEL、MICROCHIP、HOLTEK
Connector:AMP,HARWIN,HARWIN,SAMTEC,KEYSTONE,JST
Switch:RAFI,MEC,APEN,Omron,DS
Crystal:Taitien,TGS,Citizen,MURATA
2. Procurement policy:
a. Standard part mass order, like IC, will only use authorized agents from original manufacturer's official website
http://www.cn.nxp.com/about/sales-offices-distributors/asia-pacific/distributors.html
b. Standard part low volume or rush order: digikey、 element、 RS、 mouser
c. Unique part like PCB, will choose top 10 suppliers in Shenzhen, like Suntak Circuit Technology Co., Ltd and Tean Electronic, etc.
d. Compare price from 8 suppliers, to make sure we get the reasonal best price.
e. Use alternative parts after customer's approval, and on the premise that no compromise of quality.
3. Components inspection
a. Sample stage:When there is new part, product engineer will strictly inspect every part according to component datasheet.
b. Mass order procurement:IQC inspection according MIL-STD-105E sampling inspection class II standard
c. Materials inpection equipments:
Ⅷ、Test capacity:
SMT16 AOI 19sets ICT 2sets
Function test X-RAY 8200